msproject 2003
Red Light 2003.03.08
Red Light is a Java-based Hotline client and server clone that supports Multibyte Characters, Multithread News, Icon Selector and Sound support more>> Red Light is a Java-based Hotline client and server clone that supports Multibyte Characters, Multithread News, Icon Selector and Sound support.
Note: This application is tested on Windows machines and is expected to run very slow on Mac OS X with Java 1.3.1. If you already use another Hotline client, it isnt recommended that you switch to this one yet.
Java Runtime Environment 1.3 or later.
BDD BuroDestructDesigner 2003
BDD BuroDestructDesigner is a tool considered a tribute to the famous Swiss 60ties graphic design. more>>
BDD BuroDestructDesigner 2003 is a tool considered a tribute to the famous Swiss 60ties graphic design. It's an easy tool to generate wonderful patterns, logos and color-combinations based on colored grids with circles and squares. The user can modify all the settings in a menuebar or just press some of the randomizer keys. With the save as EPS option, the screens can be modified afterwards in any vectorbased software. Enjoy the Beautiful Graphic Deliveries by Buro Destruct's BDDesigner available also for Mac OS 9 and PC Windows.

iScroll2 0.32
Scroll2 is created as a smart and useful modified trackpad driver that adds two-finger scrolling capabilities to supported pre-2005 PowerBooks and iBooks on OS X 10.3 and up (version 0.29 and later require 10.4). more>> iScroll2 0.32 is created as a smart and useful modified trackpad driver that adds two-finger scrolling capabilities to supported pre-2005 PowerBooks and iBooks on OS X 10.3 and up (version 0.29 and later require 10.4). Supported models include most aluminum PowerBooks introduced from 2003 to 2004 as well as all G4 iBooks.
Models that have two-finger scrolling already built-in are not supported! These use a completely different, USB-based trackpad, the driver of which is not available as open source.
iScroll2 is based on Apples AppleADBMouse-209.0.10 driver for the ADB-based trackpads found on older models, which is available as part of the publicly released Darwin source code (and covered by the APSL). The code added for supporting two-finger scrolling was written from scratch.
Enhancements:
- Fixed a typo in main() that caused the settings daemon to crash on load.
- Please do not use version 0.31!
- Note: This version requires Mac OS X 10.4 or higher!
Requirements:
- Mac OS X 10.4.0 or later
- 2003-2004 model Aluminum PowerBook or any G4 iBook.
AppleSpec Database 01/03
AppleSpec Database contains records of every computer ever made by Apple Computer, including Apple I - Lisas, Newtons and NeXT machines more>> AppleSpec Database contains records of every computer ever made by Apple Computer, including Apple I - Lisas, Newtons and NeXT machines. Images, code names, order numbers and historical data have also been included.
FileMaker Pro 5.x or later.
Version 01/03 via MacWorld San Francisco, 2003, saw the release of new PowerBooks (17" & 12"), but several announcements had been made during the last several months such as the 20GB iPod (and Windows versions of all three sizes), Widescreen iMac. Perhaps most interesting, however, was the release of the Burton Amp, an iPod "accessory" in the form of a snowboarding jacket with integrated iPod controls on the sleeve.
Motorola iDEN Plus Modem Script 2003~03
Motorola iDEN Plus Modem Script is a program which supports iDEN phones to operate working as wireless modems for the Mac. more>> <<less
MrPostman 1.2.1
MrPostman is an email gateway from local POP clients to different web mail services more>>
MrPostman is platform independent and was written in Java.
It is being designed for extensibility so is easy to add more web mail services to it.
Webmail Providers Supported:
- Yahoo
- Hotmail
- Mail.com
- GMail (Google)
- Outlook Web Access (Exchange 5.5)
- Outlook Web Access 2003
- indiatimes.com
- Gossamer Mail
- Juno/Netzero
- RediffMail
Enhancements:
- This release mainly fixes problems with Java 5.0 and is more tolerant, when retrieving mail.
PRC-Tools OSX r3
PRC-Tools OSX - OS X port of the popular Palm OS development environment more>>
Since Metrowerks has dropped Mac support in CodeWarrior for the Palm OS platform on February 2003, "PRC-Tools for OSX" remains at the moment the only Palm OS development environment that runs natively under Mac OS X.
Be sure to read the 3-step tutorial at www.zenonez.com/prctoolsx/ and youll find out how easy it can be to start developing applications for you palm handheld under Mac OS X.
This package also includes other stuff which is not directly part of PRC-Tools software, but absolutely necessary to complete the Palm OS development environment.
Enhancements:
- PRC-Tools for OSX r3 includes the latest version of the tools (version 2.3) that was released on September 18, 2003.
- It adds Mac OS X Panther compatibility.
- In addition to the m68k compilers, r3 now includes ARMlet tools.
- A new version of the resource compiler is included ("PilRC v2.9 patch release 10")
- The Palm OS SDKs location has been moved from /Developer/Palm OS Support to the more "standard" location /opt/palmdev.

RationalPlan Project Viewer 3.14
RationalPlan Project Viewer is a professional and smart tool which can help anyone (from project stakeholders to team workers) view projects in detail. more>>
RationalPlan Project Viewer 3.14 is a professional and smart tool which can help anyone (from project stakeholders to team workers) view projects in detail.
Although the project managers plan and control the projects from start to end and make all the necessary changes, there are some other people, the stakeholders that need to check and overview the projects evolution into their smallest detail. RationalPlan Project Viewer is freely distributed as a viewer for the products. Besides it gives you the possibility to import MSProject files and to view them also for free. That makes RationalPlan Project Viewer a free viewer for both RationalPlan and for MSProject.
Major Features:
- All original views and data are available
- Import MSProject files so you can view them for free
- Export to other formats and printing are active
- It opens files created either with Single Project or Multi Project version
- View/hide critical path command is enabled
- Last but not least you can have an unlimited number of free installations
Requirements: Java Runtime Environment 5.0, Mac OS X 10.4 or later.
eScope 1.0.3
eScope is an application for controlling personal horoscope. more>>
Enhancements:
- Fixes a parsing error that began to appear in May of 2003
Requirements:
- Mac OS X 10.2 or later.
ApplMetal 1.0
ApplMetal - Metall icons set more>>
ApplMetal is an icon set featuring 4 metall application icons.
All icons are aquafied and look their best in 128x128 at 32bit mode.
MKVtoolnix 2.0
MKVtoolnix - Create/alter/inspect Matroska files more>>
They do for Matroska what the OGMtools do for the OGM format and then some.
Since May 1st 2003, the Matroska libraries themselves and my Matroska tools are officially released as a first public beta version. Although all of them are still under heavy development, I urge you to download the software, test it and report any errors you encounter to me. Im always grateful for good bug reports because I miss so many mistakes and you guys normally find them. Your feedback is important to me :)
Shawn Holwegner has built native mkvtoolnix binaries for Mac OS X 10.3. Due to some problems with mmg and wxWindows on this platform mmg is not present, but all the command line utilities are fine.
Enhancements:
- Altivec optimizations.
Unreal Tournament Demo Fix 2003
Allows UT2003 demo to host retail users. more>>

BitNami WordPress Stack 2.7.1-0
An open source installer for WordPress, a free personal publishing platform. more>>
An easy to use installer for WordPress, which is an open source, standards-compliant, fast, light and free personal publishing platform. The project was started in 2003 as a personal publishing platform, with a set of features designed to make the internet publishing experience easy. WordPress blogs now reach a combined 70 million global visitors and 300 million pageviews each month.
De StripDatabank 2002-2003
De StripDatabank is a free program that includes 22.000 pre entered albums with monthly updates on the website. more>>
De StripDatabank 2002-2003 is a free program that includes 22.000 pre entered albums with monthly updates on the website. The user can add covers and new records. Keep track of your comics and magazines. (Dutch - Flemish) There is also a CD-ROM for sale with 15.000 front- and back covers.
It is a Windows .EXE file that can be opened with the latest version of Stuffit expander.
PiXel Check 1.2
PiXel Check - LCD piXel testing utility more>>
Click the mouse button or press any key to dismiss a test or jump to the next color in the "Automatic" mode.
To the best of my knowledge, this is the FIRST and ONLY LCD pixel checking utility for OS X. Why do I say this? Well, I couldnt find any, so I wrote PiXel Check! :)
For those who care, it was written in Objective-C using Cocoa.
Enhancements:
- This version of PiXel Check is dedicated to the seven brave men and women of the Space Shuttle Columbia who lost their lives on February 1, 2003.
- Multiple monitor support! There are no options to select, it just magically detects your extra display(s).
- Help (English) is now available from within the application.
- Added Italian localization, thanks to Max Rotunno.
- Cleaned up more code and corrected a description faux pas relating to Black and White test modes.